The roof replacement portion of the Glen Rock Public Schools 2008 referendum project involved documentation of existing conditions, architectural evaluation, design, & construction documents for the demolition of existing deficient roofing and replacement with new. Also included were an 80 kw photovoltaic system at the High School/Middle School and a 40 kw PV system at Coleman Elementary School.*

  • High School/Middle School: 86,800 sf roof replacement(pictured above)
  • Coleman Elementary School: 37,000 sf roof replacement
  • Byrd Elementary School: 17,800 sf roof replacement
  • Hamilton Elementary School: 18,000 sf roof replacement